Sample design — Holly Springs, North Carolina
This is actual engine output.
A complete MACRILON package for a 495-home underground FTTH area in Holly Springs, NC — every address verified against Wake County parcel data. Boundary in; routed map, plan sheets, CAD, schedules, BOM and permit exhibits out. Street names stay on the drawings, the way a crew reads them.
Not PE-stamped. Not for construction. Every package is preliminary until a
licensed engineer reviews it and a manager releases it. Buildability and QC scores are advisory checks, not a field pass.
Explore it live — no login
Open the real interactive design for this 495-home serving area — pan the routed map in your browser. The full engineering package is available on request.
Design overview & bore schedule
Two sheets from the package: the network over aerials, and the first bore-schedule sheet crews price from.
Design overview overview sheet
Feeder, distribution, splitter terminals and their serving boundaries, as shipped in the package.
Bore schedule sheet 1
Every road and utility crossing with length, depth and conduit size — the same table the permit exhibits are built from.
Deliverables in this package
The same files a reviewer opens on a live job — no login needed for this sample. Every sheet carries PRELIMINARY — NOT FOR CONSTRUCTION — pending PE review.
| In this package |
| Interactive routed map open now | map ↗ |
| Design review — stages, QC, every deliverable | on request |
| CAD set (CONSTRUCTION.dwg / .dxf) | on request |
| Construction plan set (PDF) | on request |
| Bore schedule & crossing profiles | on request |
| Permit exhibits | on request |
| Cable schedule & bill of materials | on request |
The full engineering package — CAD, plan set, schedules, BOM and permit exhibits — is shared on request with design partners.
Request it →
| Plant in this sample |
| Market | Holly Springs, NC |
| Homes passed / serviceable | 495 / 495 |
| Primary splitters (1×8) | 22 |
| Terminals (1×4) | 65 |
| Handholes | 255 |
| Total cable footage | 52,597 ft |
| Construction | Underground |
PLANNING — pending engineering review
Distributed-split architecture: cabinet → 1×8 primaries → 1×4 terminals → drops. Numbers from the package summary.
What a live run on your boundary adds
Your own package uses your standards PDF and splitter conventions.
Field corrections become rules for the next design in that market. We do not publish every artifact from this sample
(the house-count roster, the make-ready report) because those carry takeoff detail — in a working session you get the complete set on a boundary you already engineered.
Run it on your market
30 minutes, your boundary. We walk the package with your engineers. Comparing it to your ground truth is the demo.