A feasibility study or grant application lives or dies on its homes-passed count and cost estimate. If those numbers shift after award, the shortfall is a public problem — yours.
Most municipalities and utilities don't keep fiber design engineers on staff. Consultant studies take months, cost six figures, and produce a PDF — not a living design you can iterate on as the project scope changes.
DOT crossings, railroads, water, and neighboring jurisdictions each add a permit and a timeline. Discovering them after design is how public projects slip.
Without an independent engineering baseline, you're comparing contractor bids against each other instead of against ground truth.
Deliverables are planning-grade and engineer-reviewed — decision support and a head start for your engineer of record, not a substitute for one. Full methodology on the accuracy page.